Repair toilet that is leaking on the plumbing pipework in staff bathroom #23001.
20.0
11.
Repair loose climbing rails on playground play structure next to the slide on the K-1 playground. Priority repairs for safety are necessary.
15.0
General Comments
Replace burned out lights in ceiling light fixture in classroom bathroom #208A. Repair nonfunctional elevator in school building. Priority repairs are needed on the elevator to allow disabled students and staff ease of access to the top floor.
Repair leaking toilet fixtures in class bathrooms #212A and #214A.
20.0
5.
Repair nonfunctional activation sensor on faucet on hand wash sink for girls bathroom #107.
15.0
6.
Repair ceiling leak in the modular building boys bathroom #M1-02A. Repair ceiling leak in staff bathroom #300I. Replace water damaged ceiling tiles after the sources of these leaks have been fixed. Replace missing ceiling tiles in the special needs class bathroom #121A and in classroom #109.
15.0
8.
Repair broken wall vent cover in art class kiln room #111B The louvers in this wall vent do not shut allowing entry for pests, pollen, and dust into the building.
20.0
11.
Repair worn cable covering on rope ladder on the 4th and 5th grade playground. Repair loose climbing rails on play structure on the 4th and 5th grade playground. Play climbing structure on the 4th and 5th grade playground is loose and the whole structure shakes. The footings on this structure should be secured and braced to strengthen it. Play disk structure on the pre-k playground has a broken support leg and should be repaired or removed. All playground items listed are priority repairs and should be fixed A.S.A.P due to safety concerns.
Repair nonfunctional drinking fountains in classrooms # 201 and # 204.
20.0
4.
Repair toilet leak in Modular Building Girls Bathroom M-1-03A.
20.0
5.
All hand wash sinks are nonfunctional for Girls and Boys Hall Bathrooms #117 and #115. These hand wash sinks must be repaired A.S.A.P. (Priority Sanitation Item in facility) Repair nonfunctional hand wash sink faucet in Boys Hall Bathroom # 2300E. Repair clogged sink drain in Art room # 111.
30.0
6.
Repair broken closing arm on the entry door to Modular Class building. Repair ceiling leak in classroom # 301 A.
15.0
General Comments
Repair loose climbing bars on outside play structure on playground in front of the school building.
The water fountains in rooms 304, 216, 202, and both water fountains across from ladder room 2300B need to be adjusted in order to increase water pressure.