Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
VGB information verified. Items in compliance with VGB letter(s) on file at time of inspection.
0.0
22.
Better clarification of pool name (family pool) is needed on signage posted. Please adjust. Permit issued.
0.0
24.
One strainer basket provided, but one extra strainer basket is needed for additional pump. There are two pumps for this pool. Obtain additional strainer basket for pump.
No imminent hazard found in pump room at time of inspection. Visible bonding wire attached and intact to pump. Have an electrician evaluate all of the components to determine function, if not done so prior to permitting inspection. If an electrician finds a repair is needed, obtain an electrical permit from the appropriate municipality and have the corrections inspected. Flow rate of pump 200 gpm at time of inspection.
4.0
General Comments
Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
Address posted by emergency telephone spelled incorrectly. Also, pool phone number area code posted is incorrect. 911 has correct pool address and phone number. Address and phone number posted blacked out with white tape and and re-written with a black sharpie. Corrected during inspection. No points taken. Address on permit updated to reflect changes.
0.0
24.
One strainer basket provided, but one extra strainer basket is needed for additional pump. There are two pumps for this pool. Obtain additional strainer basket for pump.
4.0
General Comments
Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
No night swimming.
No imminent hazard found in pump room. Recommend an electrician come out and further review ground wire.