Location: 4879 One World Way WAKE FOREST, NC 27587 Facility Type: Schools Inspection Date: 07/25/2023
Score: 96.5
#
Comments
Points
6.
Repair chipped wall tile beneath urinal in the 2-3 boy's hall bathroom. Repair chipped wall above interior closet door in the music room.
15.0
8.
Repair nonfunctional ceiling light fixtures in the media center. Repair torn covering on ceiling ventilation duct work over the lighting crow's nest in the auditorium. Insulation is exposed at this tear on the ductwork cover.
20.0
General Comments
Replace broken backboard on basketball hoop on the playground. Priority repairs for safety are needed due to broken sharp edges of the backboard.
Location: 4879 One World Way WAKE FOREST, NC 27587 Facility Type: Schools Inspection Date: 07/27/2022
Score: 96
#
Comments
Points
3.
Drinking fountains at boys bathroom for sixth grade hall and girls bathroom for the seventh and eighth grade hall have low water pressure and require repair.
20.0
8.
Lighting and air conditioning in the glass lobby are nonfunctional and require repair. Priority repair item.
20.0
General Comments
Remove rotted wooden platform from garden area. Deteriorated boards on the platform have fallen out. Please remove A.S.A.P. due to safety concerns. Repair torn covering on wiggle worm playground structure. Sharp edges on the torn covering could cause possible cutting hazards. Construction items identified on the prior inspection have been repaired and construction of the new wing for the gym and auditorium is near completion.
Location: 4879 One World Way WAKE FOREST, NC 27587 Facility Type: Schools Inspection Date: 08/03/2021
Score: 95
#
Comments
Points
4.
Water flow on toilet fixtures in the new building gym girls bathroom and family bathroom was low and requires adjustment for better flushing. Repair toilet that is leaking at the flush valve in the girls 4-5 bathroom in the existing building.
20.0
5.
Repair nonfunctional hand wash sink in the sixth grade boys bathroom in the new school building.
15.0
6.
Repair ceiling leak in the stock room for classroom #709 in the new building.
15.0
General Comments
New school building on campus is in the final stages of construction. A follow up inspection will be conducted by Wake County Environmental Services to verify that all construction work in reference to the new school building sanitation requirements has been completed. Occupancy for the new school building has not yet been approved by the Town of Wake Forest Building Inspection Division as of the time of this inspection. Repair nonfunctional light fixtures in the existing building office staff bathroom for men and in the girls K-1 bathroom.