Repair leaking and nonfunctional hand wash sink at the entrance to boy's bathroom #0121. Repair hand wash sink that has poor water flow for washing in class bathroom #1302A. Repair hand wash sink faucet that has a broken press activation valve in the entrance to boy's bathroom #1625. This hand wash sink faucet does not stop water flow when the activation valve is pressed.
15.0
6.
Repair ceiling leaks present in classroom #1201. Replace water stained ceiling panels in this classroom after the sources of the ceiling leaks have been fixed.
15.0
11.
Repair loose hand railing on support post for monkey bars on the K-2 playground structure. Repairs for safety are needed.
School sewage pump station has not been authorized as of the time of inspection for pumping of wastewater from the school building to the Town of Holly Springs sewer system. Wastewater from the school is being pumped and hauled from the site to an approved sewage treatment plant. Pump and haul of wastewater is not an approved method of wastewater and sewage disposal. The school building is now occupied by students and staff. Pump and haul of wastewater from the school building is not an approved long-term option for wastewater and sewage removal. The verification of performance and approval of the sewage pump station for connection to the Town of Holly Springs sewer system should be expedited for the school building. This approval for connection to the Town of Holly Springs sewer system is a priority sanitation concern for the school.
150.0
General Comments
Initial sanitation inspection of this new school facility.
School is currently occupied by students and staff from Baucom Elementary School.
No wastewater was backing into the school building or surfacing on the school grounds at the time of this inspection. All bathroom fixtures and sinks were functioning properly at the time of inspection.