Materials stored outside pump room. Cluttered. Materials moved during inspection.
4.0
25.
Small leaks in pump room. Damaged wall on left side when walking in. Something to keep eye on.
2.0
General Comments
Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
dry chems spilled out of bags and formed blob on floor
2.0
General Comments
Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
Mesh fence mashed down, repaired during the inspection. Points taken but not closing.
4.0
23.
Install cl flow meter.
4.0
General Comments
Issued seasonal outdoor wading pool permit.
Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
This pool must remain closed until the local and state closure orders currently in effect as a result of the COVID-19 pandemic are terminated.
No night swimming.
Pool staff and patrons are strongly encouraged to comply with the most current CDC guidance concerning social distancing related to the COVID-19 pandemic.
Gate repaired but must mesh fencing must be replaced within 24 hours, prior to opening.
4.0
22.
Add pool to description at 911
0.0
General Comments
No night swimming. Wake County Plan Review and Recreational Sanitation Section recommends pools be hyper chlorinated at least twice a month. This activity should be accurately logged on the CPO check list form.
Repaired gate to obtain 48” height and gap at bottom to as small as possible due to deck. Replace gate with new chain link and proper heights before opening.
4.0
22.
Add pool to 911 description
0.0
23.
Add cl flow meter
0.0
29.
Hot water must be less than 110F
2.0
General Comments
No night swimming! Issued new permit. VGB drains must be replaced prior to 2019 opening!