Repair clogged hand sink drain in the art classroom.
15.0
6.
Repair roof leaks in trailer #2. Replace water damaged and water stained ceiling surfaces in the trailer two classrooms after the repair of leaks. Replace loose railings on deck entry steps. Replace loose and deteriorated floor boards on the class trailer decks. Priority repairs of the deck floorboards and step railings are necessary to prevent possible injury hazards.
15.0
General Comments
Initial sanitation inspection of new school facility completed.