Repair clogged and overflowing toilet in boys bathroom #327. Repair urinal that has a major leak on its water supply pipe. The urinal leaks when flushed. The leaking urinal is located in boys bathroom # 403. Replace broken and missing flush valve on urinal in boys bathroom #114. This urinal does not flush. Repair clogged and nonfunctional toilet in girls bathroom #112. Repair toilet in the second stall of girls bathroom #260. This toilet has poor water flow and does not fully flush. Repair nonfunctional urinal in boys bathroom #214. Repair toilet that has a major leak along water pipe when flushed in boys bathroom #214. This toilet is in the end stall of boys bathroom #214 and has poor water flow. This toilet does not flush due to the leak. Repair toilet that has poor water flow for flushing in staff bathroom #201B. Repair clogged mop sink drains in custodial closets # 212, #113, #402. and #309A. Priority repair is needed to allow custodial staff to make use of these mop sinks in their daily cleaning duties.
40.0
5.
Repair one nonfunctional hand wash sink in boys bathroom # 654. Repair two non functional hand wash sinks in girls bathroom #656. Repair loose hand wash sink faucet in boys locker room bathroom #710. Repair clogged sink drains in science lab classrooms #308, #310, #261, and in special needs classroom #208. Repair clogged hand sink drain in boys bathroom #264.
30.0
6.
Repair or replace chipping and damaged interior ceiling panels in the gym from possible roof leaks. Verify repair of these possible roof leaks in the gym. Repair roof and ceiling leaks in the auditorium lobby, in the front hallway at the gym entrance, in both dining rooms of the school cafeteria, over the air conditioning unit in the cafeteria dining room (Maximo #65186), in classroom #117, in the hall at room #107, in stair way #7, in stairway #10, in science lab classroom #100, and in the hallway at classroom # 268. Replace water damaged ceiling tiles after the sources of these leaks have been repaired. Carpeting in all classrooms of the 200 building are permanently stained and in need of replacement. Replace broken floor tiles in rear shower stall of the boys locker room. The board currently covering these broken shower floor tiles prevents access to this shower drain which should remain uncovered if plumbing line repairs are necessary. The board is also not water proof and can break and splinter. Remove the board and complete replacement of the shower stall floor tiles. Reattach loose metal floor threshold in doorway from boys locker room #710 entry way into the gym. Priority repair needed to prevent possible trip hazard. Replace broken wall base tiles in the shower rooms and bathrooms of the boys and girls locker rooms #704 and #710. Replace broken and damaged wall base tile in girls bathroom #311. Replace broken floor tiles around sewer cleanout in the lobby at the entrance to boys bathroom #327. Replace broken floor tiles around floor drain in boys bathroom #403. Replace loose, sagging, and deteriorated floor boards on entry ramp, steps, and deck for modular building #1. Priority repair is needed to prevent possible trip and fall hazards. Reattach loose metal step treading on the edge of exterior steps in the breezeway between the eighth grade building and the 400 hall. Repair is needed to prevent trip and fall hazards. Repair areas of chipping wall paint in staff bathroom #309C, in the eighth grade stairway adjacent to the assistant principal`s office, in the art class kiln room #130B, and in boys bathroom #114. Repaint chipped ceiling paint in the art class kiln room #130B. Replace missing floor tiles in the art class kiln room #130B. Replace floor tiles that are permanently stained from water damage and possible mold growth caused by prior flooding in the art classroom #130.
30.0
8.
Reattach loose insulation covering on HVAC ductwork in the industrial arts classroom #410. Repair torn insulation covering on HVAC ductwork in the auxiliary gym room #5. Repair chipping paint on ceiling HVAC ducts in the industrial arts classroom #410. Clean sawdust buildup from the tops of the ceiling HVAC ducts in industrial arts class #410. Remove dead bugs and insects inside of ceiling lights in stairway #10. Repair nonfunctional ceiling light in the special needs class bathroom #204B. Replace broken light on ceiling fire alarm in boys bathroom # 327.
20.0
General Comments
Ovens in home economics class #405 contained build up, grease residue, and food crumbs and require cleaning. Storm drain on the patio outside of the art classroom #130 clogs and overflows frequently. This causes interior flooding in the art class during heavy rainfall. Recommend installing a durable screen over the pipe inside of the storm drain to prevent blockage of the pipe caused by debris in runoff. Scrub trees are growing out of shrubbery at the entrance to the gym and at rear exterior entrances to the school building. Lawn area adjacent to the art classroom #130 was overgrown. These areas require mowing and trimming by grounds maintenance crews. Replace torn gasket seal on refrigerator door in special needs class kitchen #204.
Repair nonfunctional drinking fountain in auditorium lobby.
20.0
4.
Repair clogged toilet in girls bathroom #210. Repair leaking toilets in boys bathroom #114 and in girls bathroom #112. Repair two nonfunctional urinals that have poor water flow in boys bathroom #654. Repair clogged urinal in boys bathroom #327. Repair clogged toilet and nonfunctional urinal that has low water flow in boys bathroom # 403. Replace damaged and stained ceiling tiles in girls bathroom #311. Repair chipped and peeling wall and ceiling paint in boys bathroom #318. Repair stained ceiling covering in boys bathroom #327.
35.0
5.
Repair nonfunctional hand wash sink in boys bathroom #114.
15.0
6.
Mold growth is present on the walls of teachers lounge #106. The sources of the mold growth should be identified and corrected and the mold damaged wall panels in this room should be removed and replaced. Wall pipes in stairway #330 are leaking and mold growth is present on the insulation covering these pipes. The leaking pipes should be repaired or replaced and the mold covered pipe insulation should be removed and replaced. Repair chipped and peeling wall paint in stairway #330 and on the 300 hall. Repair ceiling leaks in the media center corridor # 412, in the computer lab room #203, in custodial closet #212, in classroom #117, and in the chorus classroom # 625. Replace water stained ceiling tiles after these leaks are repaired. Repair damaged ceiling cover in the art classroom #130 stockroom. Repair loose and buckling wooden floor covering in the aux. gym room #5.
15.0
9.
Replace broken shower chair in Shower stall in boys locker room #710. Priority repair is required due to exposed metal edges from support poles on this broken shower chair. Seal hole in the ceiling of the varsity boys locker room # 708.
35.0
General Comments
Archery class supplies were stored in the Women's coaches staff bathroom # 703. Bathrooms are not clean storage locations and storage of class supplies in restrooms is an impediment to the cleaning and maintenance of these facilities. School grounds are in need of mowing due to the height of the uncut grass.
One Water fountain in main hall (that`s leading from the main office) has a water fountain with low pressure. The pressure around are close to the mouth piece. Turn up water pressure to the water fountains. All water fountains are to have adequate pressure.
20.0
6.
Baseboards in bathroom of band building contains damage. Room 501 floor shall be swept and better maintained. Remove spider web from cabinet in room 501 as well. Repair floor damage to the multipurpose gym floor. Replace blown light bulbs throughout.
15.0
8.
Replace blown light in main hall leading from the main office building. Clean dusty vents throughout school classrooms.
0.0
11.
Observed several chemicals such as dry erase board chemicals and Clorox wipes stored exposed.(room 303)
Toxic materials shall be used as directed on the label and handled and stored to avoid
health hazards. All chemicals shall be stored inaccessible to the students.
Some of the water fountains have low pressure. The pressure around the fountains are close to the mouth piece. Turn up the water pressure on the water fountains. All water fountains must be provided with adequate water pressure.
20.0
4.
In several of the boys and girls restrooms throughout the school the paint is peeling on the walls. All walls must be in good repair. The paint is especially peeling bad around the urinals in the restrooms.
15.0
5.
Repair the hand sinks in building where the computer classes are taken. In each restroom one hand sink was not working.
15.0
8.
Replace the blown light bulbs in the school hallways. Replace the torn screen n the girls restroom in the building where the computer classes are taken.
0.0
9.
(9) In both locker rooms where was a large hole in the wall in the shower stall with the seat. All fixtures must be in good repair. In both locker rooms the floor titles is pitted and some are missing floor title.
15.0
General Comments
3. In the boys locker room there was a broken water fountain. Clean the water fountains in the locker rooms. 8. Replace all blown light bulbs in the school. Repair the ripped window screen in the girls restroom where the computer classrooms are located.
Repaint the walls in the 8th grade boys restroom the paint on the wall is peeling. Clean the walls and floors in each restroom to remove the marks.
15.0
5.
Replace the broken water faucet handles in the boys restrooms on the second floor in the main building. In the 8th grade building replace the water faucet handles that are pitted. All fixtures must be easy to clean and in good repair. In the 8th grade building in the girls restroom there was on stall that did not have a door.
15.0
7.
Keep all storage at least 15 inches above the ground to facilitate in the cleaning of the floors.
10.0
8.
Clean the blinds throughout the school to remove the dust. Remove all the dead bugs and spider webs in the window seals throughout the school building.
20.0
9.
In both the girls and boys locker rooms several of the shower fixtures are rusty. Some of the faucet handles are starting to pitt. All fixtures must be easy to clean and in good repair.
20.0
General Comments
6. Reattach the shoe molding in room 259. Clean the walls in the 8th grade stairwell. 9. Clean out the showers in the girls and boys locker rooms. Replace the missing title on one shower in the boys locker room.
The modular classrooms are not being used as classrooms. The modular units are being used as storage units.
Pink film found on the water fountains located in the 6th and 7th grade hallways. One water fountain, the middle one, was not working close to the auditorium. Must be clean and in good repair.
20.0
4.
Stained toilet seats found in both girls and boys restrooms on the 6th grade hallway (210,214). Replace the loose toilet seats in the 8th grade hallway. Cracked toilet seats (2), in the girls restroom, on the upstairs 8th grade hallway. Bathroom 658, ladies restroom, had one toilet, second stall on the left, that did not flush. Peeling paint on the wall located in the 8th grade upstairs boys restroom. Address some gaps in the flooring/wall on the 8th grade hallway boys restroom.
35.0
6.
Repaint the doorway trim in multiple classrooms in the 100's building. Seal the loose wallpaper in room 266. Cracked floor tiles in the 7th grade hallway. Clean flooring in the art room. Clean bottom part of wall in room 305. Damaged floor tiles in room 303. Address the corner wall damage in 302. Fill in gaps on the wall in room 300. Room 304; loose base on wall and stained flooring. Room 302; patch hole at bottom base of wall, carpet damage, fill-in gaps in wall. Room 320; replace stained ceiling tiles. Room 321; holes in wall and damaged carpeted floors. Clean the walls of the 8th grade stairwell. Room 317; repaint doorway trim.
15.0
General Comments
8. Clean the dead bugs, in the light shields, in the stairwell of the 8th graders. Dust build-up on ventilation units located in rooms 212, 213
several of the smaller bathrooms and the upstairs womens bathroom in 300 building still have acoustic tile ceilings; replace the tile with vinyl coated ceiling tile; repair flaking paint in girls room 112 and boys next to 113; the boys room also needs to have walls and ceilings cleaned; repair moisture damaged walls in 300 building upstairs mens room
15.0
6.
several rooms in 100 building need repair to paint and ceiling; 110 , 115 , and especially 116 have peeling paint and falling ceiling tiles; paint damage in 111; peeling paint in the large room next to 130; water damage to the staircase ceiling near 130; the trailers have varying degrees of damage to floor tiles, carpet, and ceiling tiles; the 300 building has a lot of moisture damage to the paint in the areas around the windows; 306 has mildew on the ducts
15.0
9.
one shower stall in the girls locker has heavy paint damage; the ceiling has some moisture damage; the boys locker has one leaky faucet in the shower stall, and one shower stall has a lot of rust on the tile; caulk cracked base coving tiles in the wet areas and repair paint damage
35.0
General Comments
GC # 8 : trailer 1 has mold spots in the light fixtures; the windows still need to be cleaned; clean the band room curtains ; replace missing light shields in girls locker GC # 7 : clean the boys locker room lockers ; GC # 5 : the hand sink in 109A is rusty
several of the smaller bathrooms still have acoustic tile ceilings; all bathrooms need to have washable ceilings ( girls bathrooms in 300 building and room 337 ); clean soap stains on the walls
15.0
6.
older buildings have flaking paint around the windows ( 100 building, for example ); rooms 115, 116, 118 have paint flaking around the windows and on the walls; trailer 2 needs floor repair and the carpet is very worn; the ceiling seam in trailer 7 is breaking; the carpet in trailer 4 is also worn; paint flaking around the windows in a few rooms in 300 building ( 307, for example ); 320 has a dark liquid running from the ceiling down on the walls in the areas; replace any stained ceiling tiles
15.0
8.
clean the drapes in the band room and the high-hanging drapes on the stage; clean curtains in 313; replace torn window screen in 315; clean the high lamps on the stage; the gym building has two broken windows ( at the entrance and in the boys locker room ); dust vent covers including those in the gym; windows sills and blinds still need to be cleaned; replace the exhaust fan in the 300 building downstairs girls bathroom; trailer 1 has mold spots in the light shields
20.0
9.
one shower stall in the girls locker room needs repair due to water damage ( this was mentioned on an inspection in 2006 )
15.0
General Comments
Note : in many of the classrooms, chemicals are stored in cabinets under the sinks; remind teachers that chemicals need to be stored in a locked cabinet or at least 5 feet off the ground ; Note : wooden shelves in custodial closet are soaked with different kinds of chemicals ( replace with non-absorbent shelving );
GC # 11 : mouse droppings in a cabinet under the sink in 111
repair fountain in boys locker room; adjust fountains near 103, 119; replace mouth piece on fountain near 406
40.0
4.
ceilings in all bathrooms need to be washable ( no acoustic tile ); repair and paint bathroom walls where needed; paint is flaking off insulation on pipes inbathrooms in 8th grade building
30.0
6.
moisture coming through the walls in rooms and hallways near 108, 111; repair floor in 312; room 108 has paint peeling off the wall and there are wet/stained ceiling tiles in the hallway on the other side of that wall; evidence of moisture and peeling paint throughout that area; 111 has paint peeling especially above the window; clean baseboard tiles in bathrooms; repair ceiling above door to 120; carpet is worn and stained in many areas; replace stained ceiling tiles or missing tiles; stained ceiling ( possible roof leak ) in one corner of the gym; make needed repairs in trailer 4 ( vandalized )
30.0
8.
clean vents in boy`s locker; broken window in boy`s locker; replace blinds in trailer 5; clean light shield in trailer 2; mold inside vents in trailer 3; clean light shield in 408; clean vent above basketball goal in small gym; dust ceiling vents in gym; clean lights in elevator; replace missing window sill in 320; clean ceiling grids
20.0
9.
one shower in girls locker needs repair; fixture is corrorded and wall is damaged
20.0
General Comments
Note : wooden shelves in custodial closet are soaked with different kinds of chemicals ( replace with non-absorbent shelving )Note : provide refrigerator in 204 with a thermometer and keep temperature below 45 degrees