Repair nonfunctional toilet due to a clogged sewage drain pipe in the top floor boy's bathroom #2203.
20.0
6.
Repair ceiling leak in classroom #209. Replace water stained ceiling tile in this classroom after the ceiling leak has been fixed. Reattach loose hand railing to the wall on the upper level stair steps leading to the top floor landing in stairway #1. Priority repairs for safety are needed.
Repair cracked and broken rim on handwash sink basin at the entrance to the ground floor hall boy`s bathroom #100. Repair out of order hand wash sink in staff bathroom #202B. This sink has clogged plumbing.
15.0
6.
Ceiling leaks were present in classroom #205, classroom #2104, and in classroom #2200 at the time of inspection. Replace water-stained ceiling tiles in these classrooms after the causes of these leaks have been determined and repaired.
15.0
11.
Wooden floorboards that were replaced on the exterior entry ramp for classroom trailer #2 were left on the ground by the ramp. These discarded floorboards have exposed nail points and should be picked up and removed from the school grounds for safety purposes. Secure loose climbing/sliding Pole to playground structure platform. The play structure is adjacent to the basketball court. Priority repairs for safety are required.
15.0
General Comments
Cleaning chemicals including chlorine disinfectant wipes were left in areas accessible to students in classrooms throughout the school. Cleaning chemicals, chemical surface wipes, and aerosol spray cans should be stored in areas only accessible by school staff including closed or locked cabinets and closets.
Repair toilets in the first stall of girls bathroom #2205 and in staff bathroom #2116. Both toilets have poor water flow.
20.0
6.
Repair ceiling leaks in class rooms #205, #208 and #210. Replace water stained ceiling tiles in these classrooms after the sources of the leaks are fixed. Repair water damaged base of wall behind toilet in bathroom for classroom #213. Repair chipping ceiling cover in the media center. Repair bowed floorboards on entrance ramp to modular building #2. Priority repair item due to the potential of trip hazards caused by the uneven ramp floor boards.
15.0
7.
Class supplies for students were stored on the floor of staff bathroom #2116. Bathroom floors are not clean storage locations and the storage of these items in this restroom are an impediment to the cleaning and repair of this facility. Drinking cups were stored in the health room bathroom #103C. Items like these drinking cups stored in a restroom can become a means of transfer for communicable disease pathogens including norovirus and stomach flu. Please remove.
10.0
General Comments
Emergency changes of clothing kept in the health room bathroom #103C should be stored in a sealed plastic bin with a lid to prevent possible contamination of clothing. Cleaning chemicals including aerosol spray cans of Lysol and Clorox surface wipes must be stored in areas only accessible to staff and out of reach to students. Examples: Cleaning chemicals and aerosol spray cans should be stored in closed or locked cabinets, drawers, stockrooms, or closets.
Repair nonfunctional drinking fountain in classroom #210 and in the gym (room #111).
20.0
5.
Repair damaged edge of hand wash sink counter in classroom #211.
15.0
6.
Repair ceiling leaks in the gym (room #111), in the media center (room #110), in classroom #205, in classroom #209, and in classroom #213. Repair hole in class bathroom #213A wall behind the base tile. Replace broken window in classroom #208.
15.0
11.
Secure loose climbing/sliding pole on play structure on the second and third grade playground. Secure loose support beam for monkey bars on play structure on the 5th grade playground. (Safety Hazards) Please repair A.S.A.P.
15.0
General Comments
Repair nonfunctional elevator to allow for ease of access and exit of any disabled students or staff.
Repair nonfunctional water fountain on main ground floor hallway near gym. Repair nonfunctional water fountain in classroom # 207.
20.0
4.
Replace missing stall door for toilet in boys hall bathroom #100. Repair cracked floor tile around floor drain in boys hall bathroom #2203. (Water is leaking through this cracked floor tile and into stock room # 201 on the ground floor beneath this bathroom.) Repair this leak A.S.A.P. Repair clogged and nonfunctional toilets in boys hall bathroom # 2203 and girls hall bathroom # 2205.
50.0
6.
Repair ceiling leak in stock room # 201. Replace water damaged ceiling tile after the leak is repaired. Repair/seal the hole in the wall of room # 2102. Insulation is exposed in this hole. Repair A.S.A.P.
15.0
General Comments
Playground for Pre-K classes floods frequently after heavy rainfall. A storm water drain is needed in this playground to prevent flooding of the playground and adjacent building areas.
The water fountain in classroom 205 has low water pressure. If the water jet on this fountain cannot be raised, then completely turn the water off to this fountain. Water jets on fountains must be high enough to prevent mouth contact with the mouth guard.
20.0
4.
The walls leading out of the boys bathroom, room 2116, need a more thorough cleaning. There is a soiled residue on the lower part of these walls. Bathroom walls must be kept clean.
15.0
11.
On the 3/5 playground, the rubber flooring is torn and gapped in many areas, creating a trip hazard. On the K-2 playground, the rubber flooring is torn and gapped, the metal steaks are sticking up out of the ground, a trip hazard, and the plastic floor enclosures are falling away from the floor. Also a trip hazard. Please repair the playground issues. Playground equipment must be in good repair.
15.0
General Comments
Inspection made with employee Tim. Thanks for making improvements from the last inspection.
In the 200`s classrooms- there are still fountain/handsink combinations. Drinking fountains and handsinks cannot be in the same basin. Drinking fountains can become contaminated from handwashing.
20.0
4.
In the 200`s rooms that have bathrooms in the classrooms- the wall areas behind the toilets are corroded from urine splash.
15.0
5.
In the 2200`s classrooms- the hot water temperatures range from 129-134F degrees. Water temperatures above 120F degrees is a scald hazard. Please bring water temps. in the range of 80-110F degrees.
Bathrooms beside the cafeteria water temperature was 101F degrees. Good.
0.0
11.
In rooms 2110 and 2114- have chemicals under the sink and within reach for the children. Any chemicals labeled "keep out the reach of children" must be kept in a locked cabinet or high at a level children cannot reach them. On the playground- sand box seating is rusting and corroded, creating some sharp edges.
Water damaged ceiling tile in room 2114. Repair. The custodial closet 108 around the mop sink the wall is worn.
15.0
General Comments
The girl's restroom 2205 the caulk around the toilets is worn or missing, recaulk. 3.The water pressure is below the mouthguard on the drinking fountain in room 210. Increase the water pressure to above the mouthguard. 7. Keep all storage off the floor in the gym closet. Keep all storage 8" off the floor to facilitate cleaning. 8. Some vents are dirty in trailer 2. 5. One fixture is not working on the handsink in trailer 2.
Repair wall cover in class bathroom. Repaint stained ceiling area over gym/stage. Verify that leaks that have caused stains have been repaired.
15.0
11.
Cleaning chemicals, chemical surface wipes, white board cleaner, rubber cement, and aerosol/pressurized cans can not be stored in areas that are accesssible to children. Ex: In classes and class bathrooms. These items should be stored in closed or locked cabinets, closets, stockrooms, or drawers.
30.0
General Comments
Custodial closets must be kept locked when staff is not present. Class bathrooms should be free of all storage except for items related to bathroom use or diapering. Ex: Modular class bathroom. Sewer cleanout beside first grade playground is a trip hazard. Raise level of ground around cleanout, install a barricade, or lower height of cleanout to existing ground level.