Repair out of order toilet in the Men`s restroom in the white building on the ground floor hall at the gym. Repair clogged toilet in the handicap stall of the top floor women`s bathroom in the red building. Repair toilet in the first stall of the pre-k class bathroom in the red building that has poor water flow for flushing. Repair ceiling leaks in the top floor women`s bathroom of the red building. Replace water stained ceiling tiles in this bathroom location after the source of the leak has been fixed.
35.0
6.
Repair roof and ceiling leaks in the following school building locations: in the art classroom on the second floor of the white building, in the rear emergency fire escape stairwell in the white building between the roof window and the top floor landing, in the middle school hallway in the white building, in the teacher work room in the white building, in classrooms #302, #306, and #305 in the white building, in the top floor staff breakroom in the red building, in the top floor hallway adjacent to the staff breakroom in the red building, and in both second grade classrooms in the top floor of the red building. Replace all water stained and water damaged ceiling tiles in leak locations after leak repair work is completed. Repair water damaged wall in the emergency fire escape stairway in the white building caused by leaks. There are possible mold stains on the water damaged wall. The water damaged and possible mold stained wall surface in the stairway should be removed and replaced with clean construction material in good repair. (Roof and ceiling leaks are a repeat inspection item.)
30.0
11.
Repair cracked interior on the small slide on the central playground structure. Repair two broken swings on playground swing sets. Repair torn ground cover padding around the large central playground structure. Repair torn stair step edge covers on the elevated platforms of the central large playground structure. Priority repairs for safety are necessary on the playground equipment and grounds to prevent potential injury hazards. Cracked slide is a prior inspection item noted on the 07/20/23 sanitation inspection of the school.
Repair out of order toilet in the top floor girl`s bathroom in the brick school building.
20.0
5.
Repair loose faucet fixtures on handwash sinks in the boy`s bathroom on the top floor hallway and in the gym hallway girl`s bathroom in the white building. These faucets should be reattached into a fixed position over the handwash sinks. Repair two broken faucet control valves on handwash sinks in the boy`s bathroom on the gym hallway.
15.0
6.
Repair roof and ceiling leaks in the following school building locations: in the gym stairway, in the language arts classroom, in the 4th grade classroom, in the math classroom, in the front office, in the teacher workroom, in classroom #303, in classroom #302, at the entry to the parent`s conference room, in the second grade classroom in the brick building, in the top floor girl`s bathroom in the brick building, and in the kindergarten classroom in the brick building. Water-stained ceiling tiles should be replaced in these locations after the sources of these leaks have been fixed. Roof drains on top of the white building and gym require cleaning out to allow water runoff to drain away and prevent areas of standing water on the rooftops. Condensation drainpipe extensions that run directly from the white building roof top air conditioning units and into the roof drains could help to prevent areas of standing water on the rooftop and the roof leaks into the school building. The water damaged wall areas in the emergency stairwell in the white building require priority repairs. Repair work on the walls in the emergency stairwell should be completed prior to the return of students and staff from summer break. Repairs should be done when the school is not occupied due to the potential of insulation and dust particles being in the air during times of repair work.
30.0
11.
Repair cracked slide surface on large playground structure. The slide should not be used by students due to the potential of cuts from the sharp broken surface and due to the potential of the surface collapsing under use. Priority safety repairs are needed on the slide. Repair torn floor covering on stair steps on large playground structure. Priority repairs for safety are necessary on these steps to prevent possible trip and fall hazards. Repair or replace broken swing on playground swing set.
Repair ceiling leaks in classrooms in the white building and in ground floor bathroom and classrooms in the red building. Replace water stained ceiling tiles after the sources of all ceiling leaks have been repaired. Seal hole in the wall by mop sink in the ground floor student bathroom in the red building. Drop ceiling grid is stained in the kindergarten class bathroom in the red building. Recommend repainting the ceiling grid with a water proof and mold resistant paint to prevent further deterioration.
30.0
8.
Repair nonfunctional ceiling lights in the third floor girls hall bathroom. Replace missing vent cover on ceiling air conditioning duct in the gym.
20.0
General Comments
Repair and seal torn ground covering at the base of the slide on playground structure. Repair torn covering on platform steps on playground structure. Repairs are needed in both locations to prevent trip and fall hazards. Replace broken swing on playground swing set.
Repair or remove broken controls for personal wash spray in the toilet in the top floor women`s restroom in the white building. This same toilet has poor water flow and requires repair to flush properly.
20.0
5.
Repair two hand wash sinks that have poor water flow in the restroom for students at the gym.
15.0
6.
Repair ceiling leaks in classrooms, hallways, offices, and restrooms in both the white and red buildings. Replace water stained ceiling tiles after the sources of these leaks have been repaired. Seal hole in the wall by the mop sink in the ground floor student restroom in the red building.
15.0
General Comments
Reattach loose light shield in third grade classroom in the red building. School facility sanitation inspection completed.
Repair nonfunctional toilet in girls restroom by media center.
20.0
6.
Repair ceiling leaks in the media center, copy room, in the middle school hallway, in the hall by the math room, and in classrooms #307, #302, and # 301. (White Building)
15.0
8.
Replace missing ceiling air conditioning system duct vent cover in the gym.
20.0
General Comments
Repair torn ground covering on the playground by the swing set. (Trip Hazard)
Several classrooms in both buildings have moisture stained ceiling tiles, replace stained tiles. There are some broken floor tiles along the wall in the back 2nd grade classroom, repair broken tiles. In the 4 year old pre-K room, the tape on the floors needs to be removed, it is peeling and not easily cleanable.
Replace stained or missing ceiling tiles. Clean the floors. There are some broken floor tiles at the edge of walls. There are gaps in the floor at the egde of the wall in the stair wells.
15.0
7.
All storage should be up off the floor on shelves or racks high enough to sweep and mop under.
Clean around toilet in teachers restroom upstairs in Annex Building.
0.0
6.
Clean floors in all classrooms, electronic room, and in restrooms. Replaced stained ceiling tiles in hallway and in computer classroom. Wall cracking and peeling in science room; repair wall.
15.0
7.
Storage on the floor in classrooms, storage closets and janitorial closets; storage must be off the floor 15" to allow floor cleaning.
20.0
8.
Dust build up on window seals and on blinds in many classrooms; clean off the dust build up.
20.0
11.
Chemicals stored in reach of children; be sure to keep chemicals locked up and hand sanitizer maybe in control of the teacher; not stated on previous inspection; reference sheet provided.
Clean around toilets in men's restroom 1st floor main building.
20.0
6.
Replace floor tiles missing in 3yr old classroom; repair missing or falling coving in 2nd grade classroom; hole in wall in men's restroom 1st floor main building; repair hole in wall and spot by window to make it smooth and easily cleanable; Replace missing tile in doorway of 2nd grade classroom; repair holes in floor in 2nd grade classroom. Repair small tears on drywall in Library, main building.
15.0
7.
Keep all storage on shelving or in cabinents to facilitate cleaning in the janitor`s closets in the boy`s and girl`s restrooms in the 3-8 grade building and other rooms in facility.
10.0
8.
Dust build up on 1st grade blinds and windows; 2nd grade ceiling fans; air vents and fans in men's prayer area; replace broken light sheild in girls restroom 3rd floor main building and in men's prayer room.
B. Recaulk the toilet in the K-1 bathroom, recaulk the toilets on the 1st floor.
20.0
6.
Replace water damaged ceiling tiles in the computer lab(K-2), in the hallway by the gym, in the 3-8th grade computer lab, in the 5th grade classroom,in the teacher`s lounge 3-8th grade, and in the 2nd grade classroom. Repair small holes in the wall in the gym. The language art and Arabic classroom is missing some coving. Repair.(3-8th grade) The Arabic classroom K2 has worn floor tile. Repair or replace. Floor tile is missing in the K-1 classroom and in the computer lab K-2.
15.0
7.
Keep all storage on shelving or in cabinents to facilitate cleaning in the janitor`s closets located in the boy`s and girl`s restrooms in the 3-8 grade building,in the teacher`s work room in the 3-8th building.
10.0
General Comments
Handsink faucets are not working on the 2nd floor. Repair. Repair the worn walls in the staff bathroom K-2. Regrout worn moldy grout in the K-2 batrhoom.
Repair nonfunctional commode in ground floor student restroom.
20.0
6.
Replace stained ceiling tile in upstairs rooms. Verify repair of all ceiling leaks.
15.0
11.
Cleaning chemicals, aerosol cans, chemical surface wipes, and white board cleaner should be stored in areas that are not accessible to students. Ex: In locked or closed cabinets, closets, drawers, or storage rooms. All of the chemical products listed were in accessible areas in classrooms and bathrooms at time of inspection.
30.0
General Comments
Repair loose steps and slide on outside playground equipment.
Repair ceiling leaks in upstairs hallway and in 4th grade classroom. Replace water damaged ceiling tile in these areas and in downstairs classroom by lobby. Repair leaks A.S.A.P. Some mold growth is present in leak areas.
15.0
11.
Store cleaning chemicals like disinfectant chlorox wipes and pine oil out of reach of students. Ex: Store in locked cabinets, closets, or store rooms. These items were out in upstairs classroom and in modular building classroom.
30.0
General Comments
Contact Wake County Environmental Services to Schedule an initial inspection of new classrooms to replace modular buildings. Call 919-856-7400.