Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 03/15/2021
Score: 95
#
Comments
Points
4.
Repair leaking toilet in classroom bathroom #130A. Repair nonfunctional toilet in the second stall of girls bathroom #143. Repair leaking urinal in boys bathroom #145. Repair nonfunctional toilet in the third stall of the girls bathroom in modular building #05-M617. Repair nonfunctional toilet in the fifth stall of girls bathroom #113.
20.0
5.
Repair clogged hand wash sink drains in the following school building locations: in staff bathroom #136B, in classroom #119, in classroom #123, in classroom #127, and in boys bathroom #110.
15.0
6.
Repair ceiling leaks in classroom bathroom #124A and on the second grade hallway at room #139. Replace water stained ceiling tiles after these leaks are repaired. Repair loose wall hand rail on hallway ramp from gym to the stage at room #117C.
15.0
General Comments
Replace missing section of chain length fence by driveway entrance to playground. School facility sanitation inspection completed.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 07/01/2019
Score: 90.5
#
Comments
Points
4.
Repair nonfunctional toilet in girls hall bathroom # 143. Repair nonfunctional urinal in boys hall bathroom in the fifth grade pod. Repair clogged urinal in the boys hall bathroom #110. Repair the water damaged floor in the girls hall bathroom in the fifth grade pod. Repair loose, damaged, and missing wall covering in the boys bathroom in the fourth grade pod. Replace missing floor tiles in the boys bathroom in the fourth grade pod. Repair the broken toilet stall door in the girls bathroom #112. Repair chipped wall paint in classroom bathroom #132A. Repair ceiling leaks in classroom bathrooms #122A, #124A, and in #128A.
50.0
5.
Repair nonfunctional hand wash sinks in the boys hall bathroom in the fifth grade pod and in girls hall bathroom #112.
15.0
6.
Repair ceiling leaks in the gym breezeway hall, in the 100 hallway at the restrooms, and in classroom #124.
15.0
11.
Overgrown shrubs behind the second grade building require trimming.
15.0
General Comments
Repair loose handrail on slide on main playground behind kindergarten wing. Repair loose sliding pole on play structure on this same playground. Repair or replace splintered wooden bench by playground shelter.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 06/11/2018
Score: 98.5
#
Comments
Points
4.
One stall is out of order in room 143. Left side sink faucet in 4th grade boy's bathroom in not working. There is also a damaged tile on floor inside bathroom stall, and wall damage behind a urinal.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 06/30/2014
Score: 98
#
Comments
Points
11.
Extensive flooding under 401-404 trailers so bad that tadpoles are breeding. Flooding is mosquito harborage and causing odors inside trailers. Plumber working on leak but flooding worsened by ground topography. Recommend removing excess water under trailers to determine if water leak has been fixed. Recommend addressing topography issues to divert rain water. Recommend WCPSS grounds supervisor monitor condition every 2 wks to see if any improvement. *WCPSS should consider alternatives in case current remediation attempts do not correct standing water issue. (ie. other modular brought in another area).
20.0
General Comments
Custodial staff doing good job cleaning bathrooms. 7. Recommend add shelving in custodial closets.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 01/23/2012
Score: 93.5
#
Comments
Points
4.
Dividers between restroom stalls in several student restrooms bulging from water damage and severely damaged in 115. Girls restroom stall dividers rusting. Maintain floors/walls/ceilings/stall dividers clean and in good repair. Wall and floor separating under urinals in modular restroom building.
15.0
5.
Handwash sink in girls restroom in large modular building broken and covered in plastic - repair.
15.0
6.
Tiles broken and missing on floor in hall of large modular building. Missing ceiling tile at 135. Peeling area of wall in 142. Broken window in room 126. Maintain floors, walls, ceilings in good repair.
15.0
7.
Storage on the floor in several storage closets. Ensure that all items are stored at least 15 inches above the floor to facilitate floor cleaning.
10.0
11.
Deep standing water beneath modular buildings closest to main building. Several other low spots in lawn area that have standing water and dead grass, likely indicating long term standing water. There shall be no undrained areas on the premises.
10.0
General Comments
Water fountain leaks in rm 129 - repair. Toxic materials stored in unlocked custodial closets and kiln room. School inspected on day when no students present and when active custodial activities underway, so no immediate risk to students observed. Ensure that these rooms are kept locked when students are present. As a rule of thumb, if a container of toxic materials has any sort of warnings other than "keep out of reach of children", it should be stored in a locked closet or cabinet. Numerous items stored in restroom adjacent to utility kitchen. Recommend that only toiletry items be stored in restrooms. Rusted wire "tomato cages" stored in unlocked courtyard. Recommend that these be removed for safety. Recommend that torn vinyl mats in multipurpose room, 122, and torn vinyl couch in health room be repaired/replaced. Repair broken bench in small enclosed playground.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 07/24/2009
Score: 87
#
Comments
Points
3.
B. Increase the water pressure to above the mouthguard to the drinking fountains by room 153 and 161.
20.0
5.
A. Replace the worn cold fixtures on the handsinks in the girl`s restroom 112 and in the boy`s restroom 110.
15.0
6.
Floor tile is broken or worn in the hallway by room 137, in the hallway by room 126 and in trailer 11. Repair. The gym wall has a hole in the wall by the metal round plate. Repair. Hole in the wall by the drinking fountain next to room 136. Trailer 8 has mold growth on the ceiling tiles. Water damaged ceiling tiles in the hallway by the music room. Coving in room 157 is worn.
15.0
7.
B. Storage on the floor in closet 109,147,137,149,167,1149,114,and in the Y storage closet. Keep all storage 8" off the floor to facilitate cleaning.
10.0
8.
A. Moldy vent in the boy`s restroom in the bathroom modular. The vent cover is missing in the boy`s restroom in the modular pod. The wall vent is dirty in the gym.
20.0
11.
B.Standing water is a problem beneath modular buildings #1,#2,#3,the bathroom modular and by the track., Drainways are needed to allow standing water flow away from these buildings. Standing water can be mosquito breeding areas and lead to mold growth beneath these buildings. C. Cleaning chemicals, aerosol cans, chemical surface wipes, and white board cleaner should be stored in closed or locked cabinets, closets, drawers, or stockrooms not accessible by children. Items mentioned were in class and bathroom areas accessible to children throughout facility.
50.0
General Comments
Keep all storage out of the restrooms, storing children clothing in room 124 restroom. Repair the hole in the wall by the urinal in the boy's restroom in the bathoom trailer. The custodial closet in the modular pod floor is dirty. Recaulk the toilets in 145,143 and girl's pod modular restrooms.
Location: 8402 Pride Way RALEIGH, NC 27613-1004 Facility Type: Schools Inspection Date: 06/26/2008
Score: 84
#
Comments
Points
3.
Clean spray nozzle on water fountains. Ex: Mold growth was present around and on nozzle on fountain in second grade hall.
20.0
4.
Repair nonfunctional commode in third grade hall boys restroom. Repair ceiling leaks in modular bathroom facility. Mold growth is present in leaks. Replace ceiling tile after leaks are repaired. Replace missing floor tile in entry to second grade hall bathrooms.
50.0
5.
Clean class handwash sinks on third grade hall. Some mold growth was present in class sink.
15.0
6.
Repair ceiling leaks in computer lab, cafeteria hallway, classroom in fifth grade modular building,and in classroom #161 Replace water damaged ceiling tile after leaks are repaired. Clean ceiling pipes of dust buildup in multi-purpose room.
15.0
8.
Clean ceiling vents of dust buildup in multi-purpose room, computer lab, and modular restroom building.
20.0
11.
Standing water is a problem beneath modular buildings #1,#2,and #3. Drainways are needed to allow standing water flow away from these buildings. Standing water can be mosquito breeding areas and lead to mold growth beneath these buildings. Cleaning chemicals, aerosol cans, chemical surface wipes, and white board cleaner should be stored in closed or locked cabinets, closets, drawers, or stockrooms not accessible by children. Items mentioned were in class and bathroom areas accessible to children throughout facility.
40.0
General Comments
Repair broken slide on playground for kindergarten. Repair broken ladder on playground equipment by modular builings. Replace splintered or warped wooden components on picnic tables and benches for special needs playground. Replace broken rail on ramp for modular building #1. Repair loose counter top cover on handwash sink in room 124. Keep emergency clothing in special needs class restroom in sealed containers. Do not store class supplies, art supplies, toys, or audiovisual equipment in bathrooms. Ex: TV/VCR in staff bathroom in fifth grade modular building. Repair broken window in breezeway door. A.S.A.P.