Repair nonfunctional toilet due to clogged plumbing sewer line in the first stall of the modular building girl`s bathroom #507.
20.0
5.
Repair clogged hand wash sink drains in classrooms #201, #202, and #204. The listed sinks are the class sinks with cabinets beneath.
15.0
11.
Repair and reattach loose support beam for the yellow looping climbing/balance bars on the central playground structure adjacent to the platform at the base of the steps. The attachment for this support beam to the support post is loose by this platform. The beam should be fastened into a fixed and secure hold. Repairs are needed for the continued safety of this playground equipment.
15.0
General Comments
School building has reopened after completion of facility renovations during the 2021/2022 school year.
Repair one nonfunctional toilet and one leaking toilet in girls hall bathroom #110. Repair leak beneath toilet in boys hall bathroom #105. Repair three nonfunctional toilets in the girls hall bathroom of the second grade trailer. Repair one nonfunctional toilet in the boys hall bathroom of the second grade trailer.
20.0
6.
Repair roof leaks over the main school building interior entrance at the front office. Repair torn covering on wall pipes in the boys and girls hall bathrooms #109 and #110. Insulation is exposed on these pipes.
15.0
8.
Repair nonfunctional ceiling light in classroom #205 bathroom. Replace missing ceiling ventilation fan in the media center women`s bathroom #126G.
20.0
11.
Repair broken climbing and stabilizing cables on the circular rope ladder on the playground. Repair loose support posts, support columns, and support beams on monkey bars on the central playground structure. Repair loose support posts for the climbing and swinging rails also on the central playground structure. The playground equipment repairs are a priority due to potential safety hazards. Please repair A.S.A.P.
Reattach loose drinking fountain in classroom # 205.
20.0
4.
Repair nonfunctional urinal in boys bathroom # 310. Repair nonfunctional toilet in girls bathroom #308. Repair toilet with broken flush valve control in modular building girls bathroom. (Toilet will not flush.) Repaint rusted bathroom stall divider walls in girls bathrooms #106, #110, and #210. Repaint rusted bathroom stall divider walls in modular building boys bathroom. Replace missing wall base tiles in boys bathroom # 310. Repair and repaint chipped wall covering in girls bathroom #210. Replace torn diapering and bathroom area changing table cover in special needs class bathroom # 118B.
35.0
5.
Repair rusted hand wash sink faucet in classroom # 202.
15.0
7.
Classroom supplies and cabinets were stored in the boys and girls bathrooms in the modular building. Bathrooms are not clean storage locations and storage of these items in restrooms are an impediment to thecleaning and repair of these facilities. These bathrooms should have these items removed A.S.A.P.
10.0
11.
Repair loose ladder on play structure on playground in front of entrance to the 200 hallway. Playground adjacent to the 200 hall entrance has poor drainage and standing water and mud is a problem. This playground should be landscaped to allow for proper drainage.
15.0
General Comments
Repair leaking mop sink faucet in custodial closet #123. Repair broken cleaning chemical dispenser rack in custodial closet for 200 hall. Remove metal rack from boys bathroom #109 wall. This rack used to support a mirror. The exposed metal edges of this rack now pose potential cutting or puncture hazards. Remove A.S.A.P.
Still, water fountains all around facility need a thorough cleaning. Mildew/pink mold built up in mouth pieces. The two fountains on the 200 hall need to be replaced. They are very old an not easily cleanable. These conditions were noted on last year`s inspection. Fountains must be maintained clean. [Repeat]Full points deducted.
40.0
4.
The trailer has 2 toilets in the girls room that are not working. 1 urinal in the boys restroom is broken.
Room 310- has a broken toilet. Properly repair or replace broken fixtures. These conditions were noted on last year`s inspection. Fixtures must be maintained in good repair.[Repeat]Full points deducted.
40.0
5.
Room 210(girls bathroom)- The lavatory faucet is broken. Please repair this faucet. Fixtures must be in good repair. Room 209(boys bathroom)- Hand-towel dispenser broken
Room 308(boys bathroom)- Both hand-towel dispensers are broken.
Room 308- Both hand-towel dispensers are broken.
.
35.0
6.
Room 115(music)- The floor carpet is badly worn and torn. This carpet needs to be replaced.
Room 123- Wall is heavily soiled from hanging of the mops.
Trailer- There is a ceiling water leak above the hallway water fountains. This leak is constant and staining the wall.
Trailer(room 504)- There is a heavy ceiling water leak in the center of the room. In this room, ceiling plaster is falling and molding is falling, due to the heavy water leak. This leak must be repaired. The physical facility must be maintained in good repair.
Room 208- There is a wall outlet, for the water fountain outside of this room, and it does not have a outlet cover plate. Water can run into this outlet causing a shock hazard. Please replace cover plate. All outlets must have a cover plate.
15.0
8.
Gym- Tops of the cloth ceiling ductwork and upper wall air vents are very dusty. Please clean ventilation and ductwork in this room. Ventilation must be maintained clean.
Rooms- 100J, 103B and the copier room, all have blown ceiling bulbs. These rooms are dark, due to non-working lights. Please replace all blown bulbs. Light intensity must be maintained.
Water fountains all around facility need a thorough cleaning. Mildew/pink mold built up in mouth pieces. The two fountains on the 200 hall need to be replaced. They are very old an not easily cleanable.
20.0
4.
2nd grade trailer has 2 toilets in the girls room that are not working. 1 in the boys restroom is broken. Properly repair or replace the toilets.
20.0
5.
Replace the sink in the janitors closet in the 2nd grade trailer. It has multiple cracks in it and a very bad smell coming from it and source cannot be determined. Multiple hand sinks around facility need cleaning.
15.0
6.
Window sills throughout facility need cleaning. dead bugs in the window sill in room 501 and 504. has some rotted wood debris in it. Source of wood debris needs to be identified and repaired/replaced. Small patch of wall paper in the 2nd grade trailer girls bathroom needs patching.
15.0
8.
Ceiling air vents in the cafeteria need to be cleaned. Blinds all around need dusting.
20.0
General Comments
Special needs classroom kitchen has a potential burn hazard. Recommend considering a partition in the wall making the kitchen completely off limits to the children. Discussed with teacher of classroom and principal.
Boys bathroom room 109- Corrosion on the wall behind the toilet. Wall cleaning needed behind toilet. Please clean walls and fixtures. Walls and fixtures must be easy cleanable and clean.
15.0
5.
Boys bathroom room 126F- The hot water temperature is 111F degrees. Please monitor the temperature of this water and not let it get too hot. Above 120F degrees is considered a scald hazard.
0.0
General Comments
Inspection made with an maintenance employee Mr. Thomas.
Hall 300- Some of the water jet guards were worn and not easy cleanable. Plumbing fixtures must be kept clean and in good repair.
Some of the classrooms still have the combination fountain/hand-sink. This combination is not approved and the water fountains must be turned off.
20.0
4.
Boys Bathroom next to the cafeteria- Paint chipping behind toilets.
Boys bathroom 209- Wall repair needed behind the toilet, large gap.
Boys bathroom 310- One of the urinals is broken. All plumbing fixtures must be maintained clean and in good repair.
35.0
5.
Girls bathroom next to the cafeteria- Hand-soap dispenser is mounted too close to the faucets and cannot be properly used. This hand-soap dispenser is also blocking the use of the hot water faucet. Raise the level of the hand-soap dispenser. Hot water in this room was 99F degrees.
20.0
General Comments
In the playground area- One pole swing is broken. The chain is disconnected from the ground which allows the swing to swing out of control. Please repair immediately!
Replace stained carpet as needed. Walls in modular unit have toe molding that is missing and is in need of repair(sheet rock).
15.0
11.
In the classrooms sanitizer and chemical wipes need to be stored out of reach of children ( 5 feet or higher). Aerosol and cleaners were found in the technical room. Store in a clocked cabinent or closet or a minimum of 5 feet or higher. Observed numerous bugs crawling and in traps in mechanical and electrical rooms,
B. Increase the water pressure to above the mouthguards to the drinking fountains in room 205 and room 301.
20.0
4.
A. All bathroom ceilings need to be washable ( vinyl coated ceiling tiles, for example) Water damaged ceiling tiles in the girl`s restroom 210. The boy`s restroom in the modular building has holes in the wall where the bathroom stall has come off the wall. Repair.
15.0
6.
A. The wall is worn in the hallway in the modular unit by room 502. The floor tile is cracked in the hallway by room 106, the gym, 115 and by the music room. Repair. The learning lab has water damaged ceiling tiles. Replace. Stained carpeting in rooms 304, 314, 110 and the computer lab. The computer lab has one area where the carpet is worn. Repair.
15.0
7.
A. The girl`s restroom in the modular unit has book shelves and boxes of books stored in the restroom. Keep all storage out of the restroom. B. Keep all storage off the floor in room 309(janitor`s closet), room 107, room 113, 108 closets, the gym closet, the technology closet and the art room closet to facilitate cleaning. Keep all items at least 12" off the floor on shelving or in cabinents.
20.0
11.
In the classrooms sanitizer and chemical wipes need to be stored out of reach of children ( 5 feet or higher). Aerosol and cleaners were found in the technical room. Store in a clocked cabinent or closet or a minimum of 5 feet or higher.
30.0
General Comments
The drinking fountain is broken in room 304. Repair. The floor is worn in the janitor closet 309.
adjust water pressure at fountains in 213, 314, and in the modular hallway; repair fountains in 307 and 203
20.0
4.
all bathroom ceilings need to be washable ( vinyl coated ceiling tiles, for example ); repair cracked tiles in 209
15.0
7.
in 5th grade and several modular classrooms, book bags are on the floor; additional hooks along the walls may be needed to keep book bags off the floor; repair leaking cold water handle of mop sink in 123
10.0
11.
in the classrooms, chemicals including cleaners and disinfectants need to be stored out of reach of children ( 5 feet or higher ); cabinets under sinks cannot be used for chemical storage
30.0
General Comments
GC # 3 : fountain/hand sink combination sinks in use; fountain part is contaminated during handwashing ; GC # 8 : dust the duct work in the gym ; GC # 6 : the carpet is starting to have some stains
all bathroom ceilings need to be washable ( vinyl coated ceiling tiles, for example )
15.0
7.
5th grade book bags are on the floor and in the hallway; additional hooks along the walls may be needed to keep book bags off the floor
10.0
11.
in the classrooms, chemicals need to be stored out of reach of children ( 5 feet or higher ); cabinets under sinks cannot be used for chemical storage
30.0
General Comments
GC # 3 : fountain/hand sink combination sinks in use; fountain part is contaminated during handwashing; repair fountain in room 200 ; GC # 7 : remove storage out of bathrooms in the modular building ; Note : dust is accumulating on top of ducts in the gym