Repair nonfunctional drinking fountain on the 1600 hallway at room #1608.
20.0
4.
Repair leaking toilets in the following school bathrooms: cafeteria dining room girls bathroom (last stall), girls bathroom #1704 (two leaking toilets/leaks are on the flush valves), coaching staff bathroom #1716, (toilet is leaking and has poor water flow), in teachers/staff bathroom #1619B, and in teachers/staff bathroom #2513B. Replace missing toilet stall door in boys bathroom #1706. This missing stall door should be replaced A.S.A.P. due to exposed sharp edges of the door hinge. (Safety concern/hazard). Repair or replace urinal fixture in the boys locker room bathroom #1720A. The interior coating on this urinal fixture is chipped. Replace missing urinal in boys bathroom #2505. The drain line on this urinal should be repaired to allow for replacement of this fixture. Repair nonfunctional toilet in the stadium men`s restroom. Repair two nonfunctional toilets in the modular building girls bathroom #R814-3A.
20.0
5.
Repair two nonfunctional hand wash sinks in the stadium women`s bathroom. Repair clogged sink drain in art classroom #611.
15.0
6.
The lower ceiling ledge is stained behind the basket ball goal in the auxiliary gym #1707. This ceiling ledge is also chipping and requires repainting. Seal hole in shower wall around shower water valve in Boy`s locker room #1724. Replace missing floor tiles in boys locker room #1724 dressing area. Repair chipping ceiling paint in boys bathroom #2605. Repair roof/ceiling leaks in the modular building boys and girls bathrooms #R814-3A and #R814-2A. The ceiling leak in the boys bathroom #R814-2A is in the light fixture. Ceiling leaks are also present in the following school building locations : in the 2500 hall at the main stairs and room # 2617, in the 600 hallway by room #628, in the 500 hall by room #502, and in the art class stock room #611A. The sources of these leaks should be repaired and the water damaged ceiling tiles replaced. Mold growth was present on the ceiling of boys bathroom #505. This ceiling should be cleaned of the mold residue and the source of the moisture causing the mold growth should be addressed. A mold resistant paint might be needed in this location. Replace missing plumbing access wall cover panel in the modular building girls bathroom #R814-3A rear toilet stall. A hole is present in the wall in this location without the cover panel. Replace missing covers for recessed electrical plug outlets on the media center floor. Five floor outlets plug covers are missing. These missing floor plug covers are a possible trip and injury hazard. Please replace these missing plug covers A.S.A.P. (Safety hazard concern).
15.0
8.
Repair nonfunctional ceiling light and ceiling vent fan in the modular building boys bathroom #R814-2A. This vent fan motor is covered in dust residue and requires cleaning. The cover on this vent fan should be replaced after completion of repairs and clean up of fan components.
20.0
General Comments
Repair broken paper towel dispenser in teachers staff bathroom #619 A. Reattach paper towel dispenser to wall by hand wash/dish sink in teachers lounge #511. Replace broken toilet tissue dispenser in stall in boys bathroom #1706. Replace broken handle on dryer door in special needs classroom kitchen #1624. This broken handle has sharp and jagged edges and is a potential safety hazard. Please replace A.S.A.P. (Safety concern/hazard). Reattach loose shower bench to shower wall in boys locker room #1724. The bolts for this shower bench are coming out of the wall and the bench should be repaired A.S.A.P. Replace leaking shower spray hose in handicap accessible shower stall in girls locker room #1718A.
Fountains in modular building, on 1700 hall, 1600 hall, and all of gym hallway need cleaning and do not have adequate pressure. All drinking fountains must be clean and in good repair.
40.0
4.
Bathroom stall door missing in girl`s restroom in modular building. Toilets in girl`s 1603 restroom contain toilet out of order. Other toilet facilities that contain toilets in bad repair include girl`s 1704, girl`s 1503, girl`s 503, girl`s 2603, boy`s 1605, and girl`s near dining area. All toilet facilities fixtures shall be in good repair.
20.0
5.
Repair sink fixtures in girl`s 1603, boy`s 2605, girl`s 603 restrooms as well as in girl`s restroom outside out dining area.
15.0
6.
Carpets in need of cleaning/extracting include 524, 508, 520, 610, 606, 630, 2526, 2608, 1610, 1606, 2604, 2626, 2622, 2522, 1522, 1506, and chorus room. Floors, walls, and ceilings shall be clean and in good repair.
30.0
7.
Keep general storage at least 15 inches above the ground.
10.0
9.
Shower heads of all locker rooms need cleaning. Dressing room and shower fixtures shall be clean and in good repair.
Clean the water fountains outside of locker room 1714, 1718, 1724, and 25522. Repair the broken fountain outside of locker room 1724. All water fountains must be in good repair and easy to clean. (B). The water pressure was low on the following water fountains: outside of locker room 1714, 1718, 1724, and 2522.
40.0
5.
Repair the broken toilet in the girls restroom 1704. Replace the paper towel dispenser in the girls restroom 603
0.0
6.
Clean the carpet in the rooms 1504, and 1508. Repair the cracked floor title outside of room 1711. Clean the floors and wall in the hallways and walkways throughout the school. Clean the walls in the cafeteria area. Clean the carpet on the small stage of the cafeteria area. Repair the ceiling above the locker room 1724.. Repair the ceiling above locker room 1714. All floors must be in good repair and easy to clean.
15.0
7.
Keep storage at least 15 inches above the ground.
10.0
9.
Repair the broken shower handle in locker room 1724.
20.0
General Comments
4.(A) Clean the floors and walls in the restrooms in 603 and 1704. 8. Clean the blinds in the Human Sciences room, computer lab and Science room. Clean the blinds in room 1504 and 1508 Clean the vents in the hallway to remove the dust. 5. Repair the broken toilet in room restroom 1704. Replace the missing paper towel dispenser outside of restroom 603.
Leaking water fountains in the hallway beside of the toilet room 1716. Fountain not working in the hallway, close to the locker room 1724. Must be in good repair.
20.0
4.
Damaged urinals and toilet in men's restrooms located at 605, 1500, 1605, and close to the cafeteria. Clean the build-up on the walls and ceilings inside some of the hallway restrooms.
35.0
6.
The walls, in the hallways, need to be either repainted and/or cleaned for 500s, 600s, 1500s, 1600s, 2500s, 2600s, and sports hallway. Paint walls inside of the gym. Stained carpeted floors found in classrooms 1330, 1609, 2606, 506, 2524, and 1504. Loose wallpaper in classrooms 522 and 632. Repaint the corner walls in the 2500's hallway.
15.0
8.
Replace the blown light bulbs in rooms 1626, media center (2), and 1300s hallway. Replace the damaged blinds in rooms 1330, 1611, 2610, 1618, and 506. Must be in good repair. Clean the dust build-up found on some of the ventilation units in the classrooms, bathrooms, and gymnasium.
20.0
General Comments
Chipped wood around the double doors of the auditorium, inside part.
all three fountains across from room 1403 are not working properly; the fountains outside the locker rooms have low water pressure
20.0
4.
all bathroom ceilings, even in small bathrooms and modular bathrooms, need to be washable ( no acoustic tile ); the walls in the teacher bathrooms will need to be painted soon; paint the ceiling in 1605, and replace rusty ceiling vent covers in 1605 and 1603
15.0
5.
repair one faucet in boys room next to 1507; one faucet in the mens room adjacent to the cafeteria area does not work; lift and re-attach one hand sink in the girls room in trailer 814; one facuet in the womens locker needs repair
15.0
General Comments
GC # 6 : patch a hole in the wall across from room R814-10; clean high ledges ; GC # 8 : replace broken light shield in the womens locker
one faucet tip is missing in the boys room on the 1500 hall; several bathroom designation signs ( boys; girls ) are missing; all bathroom ceilings, even in small bathrooms and modular bathrooms, need to be washable ( no acoustic tile ); repair commode and one faucet handle in 1605
20.0
6.
replace broken mirrors in the dance room; patch a hole in the wall across form room R814-11; the floor tiles in the hallway in R814, especially near the fountains, do not fit properly and are bending up
15.0
General Comments
GC # 11 : saw one drain fly in the sink in 1514 ; GC # 7 : keep all storage off the ground; GC # 8 : high vent covers in gyms and band room need to be dusted; Note : please remind all teachers to keep cleaning chemicals including Chlorox wipes in a locked cabinet when the children are present
several ceiling tiles in the gym need to be replaced or put back in place; clean the slanted wall in the gym; replace stained ceiling tiles; clean any balled up toilet tissue stuck to hallway and restroom ceilings; a lot of the tile floors inside classrooms have black marks from tables and chairs; one cracked tile in women`s shower; walls behind several fountains are stained ( yellowish ); repair baseboards in 608; sweep the electrical and mechanical rooms frequently
15.0
8.
dust the window sills and blinds; one light shield in the media center is about to fall; clean the A/C vent covers in the lobby; one light shield in men`s locker is cracked
20.0
General Comments
Gc # 7 : keep all chemicals in custodian closets off the floor; chemical dispenser in 507 is leaking heavily; keep art room storage organized and off the floor; Note : clean the washing machine