Repair two nonfunctional drinking fountains on the kindergarten hallway.
20.0
4.
Repair two nonfunctional toilets in the girl`s bathroom on the pre-k hallway. Repair urinal that is leaking on the flush valve in the boy`s bathroom on the pre-k hallway. Clean toilet bowls of residue and build up in the boy`s and girl`s bathrooms on the main hallway. Repair chipping, peeling, and damaged walls behind toilets in the first-grade class bathroom and in the self-contained class bathroom. Repair chipping and peeling wall behind hand wash sink in the kindergarten class bathroom. Repair chipping and peeling floor covering in the main hallway boy`s bathroom. Reattach loose and peeling wallpaper in the main hallway girl`s bathroom.
35.0
6.
Repair roof and ceiling leaks in the following school locations: in the 7th-8th grade hallway, in the art classroom, in the self-contained classroom, in the 2nd grade hallway, and in the 5th grade classroom. Replace water-stained ceiling tiles in these leak locations after the sources of these leaks have been fixed. Replace torn carpeting in the 5th grade classroom and in the 7th-8th grade classroom.
15.0
8.
Repair or replace nonfunctional air conditioning systems in three school classrooms including two kindergarten classrooms and in the specials classroom. Repair of nonfunctional air conditioning systems in the listed classrooms is a priority for the health and safety of students and staff that use these classrooms. Repair three nonfunctional ceiling lights on the 2nd grade hallway.
20.0
General Comments
Sanitation inspection of new school facility location.